Funding defence technology from TRL 4 to TRL 7
Getting a defence technology from a lab result to a prototype in an operational environment is where most of it stalls. The money exists, but each source covers only part of the way.
TL;DR
Between TRL 4 and TRL 7, defence technology is funded in layers: Belgian DEFRA research (up to 80% for SMEs), VLAIO development projects, DIANA grants and test centres, and EDF research (100%) and development actions. EDF prototyping starts at a 20% baseline, so the step to TRL 7 needs Member State co-financing and buyers committed early.
In this article
- What do TRL 4 to 7 mean?
- Why is the gap from TRL 4 to 7 so hard to cross?
- How does the European Defence Fund cover these levels?
- What conditions apply to prototyping and testing?
- What can a Belgian company use before the EDF?
- How does DIANA help between TRL 4 and 7?
- What does EUDIS add?
- How do the sources stack up across the TRL range?
- What comes after TRL 7?
- How do you plan the route to TRL 7?
- Where does FADEC fit?
- Quick answers
Defence technology between TRL 4 and TRL 7 is funded in layers, because no single programme covers the whole step from a lab result to a prototype demonstrated in an operational environment. In Belgium, a company typically combines national research funding such as DEFRA, regional development support such as a VLAIO development project, NATO's DIANA accelerator with its grants and test centres, and European Defence Fund (EDF) research and development actions. The hardest step is the last one. In the EDF, system prototyping has the lowest baseline funding rate of all activities, 20%, and needs the backing of at least two governments that intend to buy the result. A company that plans for that early, with partners and future users on board, gets through; one that does not usually stalls at TRL 5 or 6.
What do TRL 4 to 7 mean?
The EU uses the technology readiness levels defined in the Horizon 2020 general annexes, which European programmes still refer to:
| Level | EU definition | What it looks like in defence |
|---|---|---|
| TRL 4 | Technology validated in lab | A breadboard or component works on the bench |
| TRL 5 | Technology validated in relevant environment | Tested under conditions close to real use, such as vibration, temperature or field data |
| TRL 6 | Technology demonstrated in relevant environment | A representative model or prototype demonstrated, for example on a test range |
| TRL 7 | System prototype demonstration in operational environment | A prototype system demonstrated with users in an operational setting |
The range from 4 to 7 is where technology turns into a system. It is also where costs rise sharply: test campaigns, integration with platforms, safety work and user involvement all cost more than lab work. And it is where the technology starts to need a customer, because a prototype in an operational environment needs an operator willing to host it.
Why is the gap from TRL 4 to 7 so hard to cross?
Three things change at once:
- Costs go up. Prototypes, integration and testing are much more expensive than research.
- Funding rates go down. Research is often funded at or near 100%; development activities closer to the market are funded at lower rates, on the logic that companies will earn from the result.
- A buyer becomes necessary. Defence programmes want evidence that governments will procure the result before they fund a prototype.
For a small company, the combination is dangerous. The share it must finance itself grows at exactly the moment it has no product revenue yet. That is why stacking different sources, and planning the order in which they are used, matters more here than at any other stage.
How does the European Defence Fund cover these levels?
The EDF funds two kinds of action. Research actions, mostly generating new knowledge, are funded at 100%, according to the Belgian Defence summary of the EDF. Development actions are financed at 20% to 90% depending on the activity, with bonuses for SMEs, mid-caps and PESCO projects.
The activities of a development action map closely onto TRL 4 to 7. In the 2026 call for development actions, they carried these rates:
| EDF activity | Rough TRL range | Baseline rate | Maximum with bonuses |
|---|---|---|---|
| Integrating knowledge | 3 to 5 | 65% | 100% |
| Studies, such as feasibility studies | 3 to 6 | 90% | 100% |
| Design, including partial tests for risk reduction | 4 to 6 | 65% | 100% |
| System prototyping | 6 to 7 | 20% | 55% |
| Testing | 6 to 7 | 45% | 80% |
| Qualification and certification | 7 to 8 | 70% | 80% |
The TRL ranges are an indication, not part of the rules. What the table shows is the shape of the problem: the funding rate drops to its lowest exactly at the prototype, the activity that brings a technology to TRL 7.
What conditions apply to prototyping and testing?
The rate is only half of it. The 2026 development call also sets conditions per activity:
- Design must be based on harmonised capability requirements jointly agreed by at least two Member States or associated countries.
- Prototyping, testing, qualification and certification must be supported by at least two Member States or associated countries that intend to procure the final product or use the technology in a coordinated way, based on common technical specifications.
- Every development action needs at least three independent applicants from three different eligible countries.
In practice, these conditions mean ministries have to be involved before a proposal for TRL 6 or 7 work is written. They often also provide the co-financing, because the costs the EDF does not cover must, according to the call document, be "financed by other means", for example by Member States or by the participants themselves. Our explainer on the EDF SME bonus shows how much SMEs in a consortium can raise these rates, with a worked example.
What can a Belgian company use before the EDF?
The EDF works best for a company that already has defence partners and a technology at TRL 4 or higher. To get there, or to take the first steps beyond it, Belgium has its own instruments.
DEFRA, the Belgian defence research programme run by BELSPO and the Royal Higher Institute for Defence, funds consortia of at least one Belgian research institute and one Belgian company. According to the DIRS description of DEFRA, projects run for two to four years; SMEs receive up to 80% of eligible costs, mid-caps up to 75% and large companies up to 65%, and research institutes up to 100%. Belgian Defence presents DEFRA explicitly as a basis for later participation in the EDF or DIANA. Pre-proposals are due in February.
VLAIO development projects fund a Flemish company's own development work. The development project has a base rate of 25% of the accepted budget, with supplements for collaboration and for small or medium-sized companies, up to 50%. Since the Flemish Defence Plan of 2025, defence and dual-use projects are eligible; our guide on VLAIO subsidies for defence innovation explains the rules and the ethics review.
Inno4Def, Belgian Defence's short-cycle innovation programme, can bring a technology into contact with operational users. External companies need an internal project champion.
How does DIANA help between TRL 4 and 7?
DIANA, NATO's Defence Innovation Accelerator for the North Atlantic, is built for early-stage companies taking dual-use technology towards defence use. According to the DIRS page on DIANA, companies selected in a challenge receive a non-dilutive grant of €100,000 and join a six-month first phase. Some are invited to a second six-month phase, with up to €300,000 more, to demonstrate their technology further and work with investors and end users on adoption.
The test centre network is what makes DIANA relevant for this TRL range. DIANA works with more than 20 accelerator sites and more than 180 test centres across the Alliance. Validating a technology in a relevant environment (TRL 5) or demonstrating it (TRL 6) needs exactly that kind of access, which a small company rarely has on its own. Any incorporated company headquartered in a NATO member nation can enter a challenge; the 2026 round closed on 3 July.
What does EUDIS add?
The EU Defence Innovation Scheme, part of the EDF, offers instruments that suit companies moving up the TRL scale:
- Technological challenges, which set up testing environments where competing teams compare their solutions; the 2026 programme includes one on AI-based tactical situational awareness with swarms of small robots and drones.
- Spin-in calls, which move results from civil EU-funded research into defence.
- Open, non-thematic SME calls and calls for disruptive technologies, with lump sum grants.
- Cascade funding for SMEs and start-ups.
- Business coaching, up to 15 days for SMEs in EDF projects.
Spin-in deserves attention from companies with civil technology at TRL 4 or 5. It is designed to bring exactly that kind of result into defence, instead of starting again from scratch.
How do the sources stack up across the TRL range?
| Stage | Typical sources | What you need in hand |
|---|---|---|
| TRL 3 to 4: proof of concept to lab validation | DEFRA, VLAIO research or development project, EDF research actions | A research partner, a defence-relevant use case |
| TRL 4 to 5: lab to relevant environment | VLAIO development project, DIANA phase one, EUDIS calls, EDF design | Test access, first contact with users |
| TRL 5 to 6: demonstration in relevant environment | DIANA phase two and test centres, EDF design and testing, EUDIS technological challenges | Partners for integration, a test campaign plan |
| TRL 6 to 7: prototype in operational environment | EDF system prototyping and testing, national co-financing, equity | Two governments intending to procure, co-financing, investors |
Equity enters at the end of the range. Investors such as the NATO Innovation Fund invest from seed to Series B in dual-use companies; our guide on how to apply for the NATO Innovation Fund explains its scope. For a company at TRL 6, equity often pays for the share of a prototype that grants do not cover.
What comes after TRL 7?
Qualification and certification, which the EDF funds at a 70% baseline, take a system towards TRL 8. After that, the question is no longer development but production capacity, and a different EU programme applies. The European Defence Industry Programme, worth €1.5 billion, funds the ramp-up of production through its Industrial Reinforcement Actions, with lump sum grants of up to 35% of eligible costs, or up to 50% when the conditions for a higher rate are met.
The next EDIP deadline for industry in the Member States and Norway is 16 February 2027, with topics on key electronic components (€122.25 million, up to €20 million per project) and on platforms and end products (€152.75 million, up to €30 million per project). The second topic covers machining, key subsystems, composites, assembly and integration. A company that is reaching TRL 7 now should know this exists, because investors will ask how the product gets from prototype to series production.
How do you plan the route to TRL 7?
- Know your TRL honestly. Use the EU definitions and document the evidence for each level you claim. Evaluators check.
- Identify the user early. Which armed force, agency or prime would host a TRL 7 demonstration? Without one, the EDF conditions for prototyping cannot be met.
- Talk to your ministry before the call. In Belgium, the national focal point at the FPS Economy and Defence's EDF contact are the first steps.
- Join a consortium for the expensive steps. Prototyping and testing are rarely affordable alone, and the EDF requires three independent partners anyway.
- Line up co-financing. Budget the gap between the EDF rate and 100%, and decide who pays it: a government, your own funds or investors.
- Use test centres. DIANA's network and national test ranges cut the cost of TRL 5 and 6 evidence.
Where does FADEC fit?
FADEC connects Flemish aerospace and defence companies with partners for European consortia, with primes and with investors. Members preparing an EDF, EDIP or Horizon proposal can add coordination support, and the Investment Council reviews investor readiness. See membership, or contact us if you are planning a route to TRL 7.
Quick answers
What do TRL 4 and TRL 7 mean? In the EU's definitions, TRL 4 is technology validated in the lab, TRL 5 validated in a relevant environment, TRL 6 demonstrated in a relevant environment, and TRL 7 a system prototype demonstrated in an operational environment.
Which EDF activities cover TRL 4 to 7? Mainly integrating knowledge, studies, design, system prototyping and testing. In the 2026 development calls, design had a 65% baseline rate, system prototyping 20% and testing 45%, before bonuses and caps.
Why is TRL 7 so hard to fund? Because system prototyping has the lowest EDF baseline rate (20%, capped at 55% with bonuses) and, like testing, qualification and certification, must be supported by at least two Member States or associated countries that intend to procure the result.
What can a Belgian company use before the EDF? DEFRA, the Belgian defence research programme, funds consortia of a Belgian research institute and a Belgian company for two to four years, with up to 80% of eligible costs for SMEs. VLAIO development projects fund Flemish companies' own development work.
Does DIANA help with testing? Yes. Besides grants of €100,000 and up to €300,000 more, DIANA gives access to a network of more than 180 test centres across the Alliance, where innovators can validate and demonstrate their technology.
Sources
- Horizon 2020 Work Programme, General Annex G: Technology readiness levels (European Commission)
- EDF-2026-DA call document: development actions through actual cost grants (European Commission)
- European Defence Fund (EDF), Research and Development Actions (DIRS, Belgian Defence)
- DEFence-related Research Action (DEFRA) (DIRS, Belgian Defence)
- Defence Innovation Accelerator for the North Atlantic (DIANA) (DIRS, Belgian Defence)
- EU Defence Innovation Scheme (EUDIS, European Commission)
- European Defence Industry Programme (EDIP) (European Commission)
- Ontwikkelingsproject (Vlaanderen.be)
Working on something this article touches?
The cluster team connects members to programmes, partners and buyers.
Talk to the cluster teamRelated articles
How to write a winning EDF proposal as an SME
How EDF proposals are scored in 2026: the weighted award criteria, the 37 out of 55 threshold, the 100-page limit, security and ethics, and an SME's role.
How to apply for the NATO Innovation Fund (NIF)
What the NATO Innovation Fund invests in, who is eligible, ticket sizes, how to submit through NIF Connect, what it excludes and how DIANA fits alongside it.
De beste VLAIO-subsidies voor deep-tech startups
Welke VLAIO-subsidies passen bij een deep-tech startup in Vlaanderen: haalbaarheidsstudie, ontwikkelings- en onderzoeksproject, mandaten en starterssteun.